Skip to content
Environment

Key Roads in Western Nepal Reopen as Crews Clear Landslide Debris

Live
Compiled by Tiroom AI from 14 sources
Excavators and a dump truck remove rocks and landslide debris on a mountain cliff road.
Nagarik News
AI Overview

Road links between Beni and Babiachour in Myagdi reopened on Tuesday evening following four days of monsoon-induced landslide blockages, restoring direct access to several local levels across Myagdi and Baglung. However, the Beni–Jomsom–Korala corridor remains severed after the Kaligandaki River washed away road sections and damaged bridge infrastructure. According to district authorities, the disruption has halted overland trade through the Korala border crossing with China, stranded travelers, and blocked festive shipments of apples and mountain goats alongside Sorha Shraddha pilgrimages to Kagbeni.

In Lamjung and Manang, clearance operations have reopened the Rambazar section of the Dumre–Besishahar–Chame highway. The Department of Roads and the Nepal Army are conducting controlled rock blasting and debris removal across damaged points, with officials aiming to fully reopen the corridor by Friday along temporary tracks after resolving a local land dispute.

Coverage

1 article

  1. AI Overview

    Traffic resumed along the Beni–Babiachour road in Myagdi after four days of landslide disruptions, while authorities accelerate repair works on severed corridors to Mustang and Manang.

    Read the full report